watonomous.github.io

  1. Electrical Division
  2. Electrical Division Home

[ Electrical Division : Electrical - Mechanical Integration ]

Created by [ Mitchell Hoyt] on May 16, 2020

The Electrical and Mechanical divisions will be running bi weekly remote sessions to plan and document the following topics

Comments:

+———————————————————————–+ | [] | | | | Mitchell | | Hoyt{.confluen | | ce-userlink | | .user-mention} - Some updates on the work done in previous term | | | | Sensor Interfacing cable management | | | | - Wires for Novatel imu unit have been routed from sideways making | | sure the seat-belts can still be used but the length of wires | | under the rear right seat has created a sort of bulge making it | | difficult for person sitting on the rear side to rest his/her | | feet on that cover. | | - There's a VLP 32 (LIDAR) control box on the roof of bolt needs a | | 3d printed or some kind of protection in case weather decides to | | change which can be issue now that the challenge has been | | extended to fall season | | - The three cameras mount was almost done thanks to Chad | | Kirton{ | | .confluence-userlink | | .user-mention} but still we have to finish mounting of new covers | | for cameras which won't go in as the diameter of cover is | | smaller than the diameter of the lens. | | - The third camera has fish-eye lens mounted on it not sure why but | | maybe (for performing disparity calculation which is an effective | | way to describe a 3D Cartesian space) which can help the | | perception team but during our testing we found that the current | | place of third camera mount doesn't really help perception team | | and needs to be somewhere just below the VLP-32 Anita | | Hu{.conflue | | nce-userlink | | .user-mention} can update you more on this. | | - The monitors on the front and rear side both have long enough | | cables for operation but the monitor stand on the rear side keeps | | falling which needs to be more stable but it's a minor issue. | | - The CAN controller near the driver's seat needs to be at a place | | which does not affect driver in any driving scenario. | | - SI team has changed switch from 1g to 10g, so we can unplug the | | other one if there's no use Rohit | | Kochhar{ | | .confluence-userlink | | .user-mention} can help you with this. | | - We have reverted back to 1-1 port PoEs (Power Over Ethernet | | injectors) from 4-4 port PoEs for cameras due to unknown hardware | | issues in 4-4 port PoEs. Rohit | | Kochhar{ | | .confluence-userlink | | .user-mention} take help from power systems for resolving this | | issue, but this resolution has led to increase in number of power | | adapters required for powering these PoEs, hence we need to use | | both power bars( one on left and other one on right). | | - Last but not least we need to have fixed positions for every | | component on compute rack, because it creates more problems for | | Mechanical team to adapt with these changes , so I would suggest | | that we follow Chad | | Kirton{ | | .confluence-userlink | | .user-mention} 's distribution diagram for this purpose (CAD | | model), and make necessary changes. | | | | {.smallfont align=”left” style=”color: #666666; width: 98%; margi | | n-bottom: 10px;”} | | | | Posted by k336pate at May 17, 2020 06:42 | | | +———————————————————————–+

Document generated by Confluence on Nov 28, 2021 22:40

Atlassian