watonomous.github.io

  1. Electrical Division
  2. Electrical Division Home
  3. Power Systems Group

[ Electrical Division : S20 Power System OKRs ]

Created by [ Sidharth Baveja], last modified on May 06, 2020

[S20.O1] Ensure Traffic Lights are ready so we can test the vehicle 

Need to have the lights in the different configurations so we can test them out.

[S20.O1.K1] Gather information we need to build the traffic lights (Joint with test track infracture )

[S20.O1.K2] Come up with a design schematic/plan, how it fits into the test track 

[S20.O1.K3] Build one traffic light, and test

[S20.O1.K4] Make changes to schematic as needed from previous test, and build rest of the traffic lights

[S20.O2] Blue light 

Have Blue light ready for Comp

[S20.O2.K1] Connect the indoor blue light.

[S20.O2.K2] Move the outdoor blue light so that it is more visible 

[S20.O2.K3] Look into more secure connections for the blue light

[S20.O2.K4] Come up with a procedure to debug any blue light issue

[S20.O3] Cable Management

Ensure Cabling in the car is very neat, allows for any hardware issues to be debugged easily. 

[S20.O3.K1] Inspect cabling, Talk to drive Crew and Derek and see if there are any immediate areas of concern

[S20.O3.K2] Redesign of ACU (Autonomous Control Unit) board so that it has a switch to turn on and off, make sure the CAN cables are out of the way 

[S20.O4] Test Track Dummy

Electric Test Track Dummy 

[S20.O4.K1] Design Review and redesign if needed

[S20.O4.K2] Build the design out on one of the motors, ensure that it works as expected

[S20.O4.K3] Build the electric dummy

[S20.O4.K4] Test Dummy at a drive crew session

[S20.O5] Radars

Getting the radars working in the car 

[S20.O5.K1] Look at the progress that we have made already on the Radars

[S20.O5.K2] Come up with a plan

[S20.O5.K3] Install the radars

\

Document generated by Confluence on Nov 28, 2021 22:40

Atlassian