[ Knowledge Base : Electrical Division Protocols and Milestones ]
Created by [ Rowan Dempster] on Jan 08, 2020
Important milestones for each electrical development cycle is as
follows.
Watonomous operates on a 2 week development cycle that will end with
every Test Track visit on Sundays.
Prerequisites: Meeting Schedule Policies
https://docs.google.com/document/d/1xwXbI2opvnQ-C6QTn_IVc-iE0uneZy5xfV7qi3yW0jM/edit#heading=h.inwk7u3x0yka
Protocols
\
Milestones
Week 1
Group Meeting 1 Milestones
- Retrospective completed for previous development cycle
- Tickets assigned
Division Meeting 1 Milestones
\
- Address & Discuss integration problems
\
Electrical Management Meeting 1 Milestones
Report from managers presented
Gantt Chart updated
- Update progress
- Adjust timelines
- Modify, delete, or add new OKRs as necessary.
WATO Wide Work Session Schedule planned
- Ticket created on WATO Integration session work board
https://phabricator.watonomous.ca/project/view/134/
WATO All-Hands and Work Session Milestones
Gantt update presented
Test Track Schedule presented
- Each group presents the tests that they want to execute 7 days from
now
Integration Points presented
- E.x. Power Systems wants to install a new ACU board and needs a 3D
printed case for it by Wednesday. (This is an integration
point between electrical and mechanical. The integration point
should include a timeline ie need to know by Wednesday)
Week 2
Group Meeting 2 Milestones
- Check up on tickets assigned
Division Meeting 2 Milestones
- Sensors interface correctly and ready to be used at the Test
Track.
- Cables are managed well, there is no more craziness going on
in the back of the Bolt. Someone with no experience with the Rugged
should be able to see and understand the source and destinations of
all the wires.
- Ensure test track equipment built by power system is working and
ready to be used by test track.
Electrical Management Meeting 2
Gantt Chart updated
- Update progress
- Adjust timelines
- Modify, delete, or add new OKRs as necessary.
WATO Test Track Day
- Sensor Interfacing will get into the Bolt and immediate confirm
that all sensors are launching and publishing data correctly.
\
- Setup the electrical components of the Test Tack Infrasture with
the help of the Test Track Infrastructure group in Mechanical.
\
Todo list created for electrical for the next development cycle
- For example: Ethernet cable comes unplugged from the IMU unit a lot,
place it somewhere more secure.