watonomous.github.io

  1. Knowledge Base
  2. Knowledge Base Home
  3. Management Tools & Training
  4. End of Cycle Reports
  5. W20 End of Cycle Reports
  6. W20.0 Software Group EoCs

[ Knowledge Base : W20.0 Infrastructure EOC ]

Created by [ Abel Joseph] on Feb 02, 2020

Heading

Name: Abel Joseph

Date: January 28th, 2020

Development Cycle: 0

Division: Software

Group: Infrastructure

Status

[GREEN]

OKR Timeline Progression

[W20.O1] Continuous Integration (2 core members)

[W20.O1.KR1] Setup for Perception

Assigned to core member

[W20.O1.KR3] Linting Configurations

Assigned to core member

[W20.O4] RViz

Assigned to core member

[W20.O5] Production Engineering

Met with Alston to discuss. Specific requirements/tasks TBD by Manager.

Link To Retrospective

https://docs.google.com/document/d/17MRHdWJs1MMUL8OJ7sCV1Htulu5uqHrA-FHA2PaTqAw/edit?usp=sharing

Core Member Engagement

Group Engagement Rate: (3 - (0 + 0)) / 3 = 100%

Link to engagement level guideline

+———————–+———————–+———————–+ | Name | Engagement Level | Activity Summary | +———————–+———————–+———————–+ | Arjun Vasudevan | MEET | Attended all meetings | | | | and trainings, | | | | assigned work, doing | | | | well. Working on O4.\ | +———————–+———————–+———————–+ | Melody Lui  | MEET | Attended all meetings | | | | and trainings, | | | | assigned work, doing | | | | well. Working on | | | | O1.KR1.\ | +———————–+———————–+———————–+ | Siddharth Surana | MEET | Attended all meetings | | | | and trainings, | | | | assigned work, doing | | | | well. Working on | | | | O1.KR3.\ | +———————–+———————–+———————–+



\

Document generated by Confluence on Nov 19, 2021 12:20

Atlassian