Created by [ Chad Kirton] on Mar 02, 2020
Name: Chad Kirton
Date: Feb 17th, 2020
Development Cycle: 1
Division: Mechanical
Group: Sensor and Compute Mounting
Yellow
[F20.O2.KR2] Design
Using design requirements, develop a design for method of mounting the converter to base
Progress: Completed
[F20.O2.KR3] Source Material/ Components
Generate PO of material or off-shelf components for chosen design ( source sponsorship for funding available ).
Progress: In progress
[F20.O6.KR1] Design and Review
Develop a feasible design for the enclosure and review with the
manager.
Progress: Completed
[F20.O6.KR2] Source Components/ Material
Generate PO of off-shelf components/ raw material and required hardware
for the fabrication of the enclosure.
Progress: Completed
[F20.O7.KR1] Update CAD
Update CAD of the mounts to suite ordered components and electrical
requirements.
Additionally complete shop drawings for the machining process.
Progress: Completed
[F20.O7.KR2] Machining
With the shop drawings, machine components in the ESMS using: Mill,
Drill press
Progress: In progress
[F20.O8.KR1] Update CAD
Have compute rack CAD updated and uploaded to grabCAD as alterations are
made throughout the term.
Progress: In progress
(Slow progress due to reading week and beginning of midterms for some members)
Group Engagement Rate: (3 - (1)) / 3 = 66.7%
Link to engagement level guideline
Name Engagement Level Activity Summary Matthew Lee Meet Member has completed [F20.O2.KR2] and is beginning to work on [F20.O2.KR3]. Aryan Trehan Meet [Member has completed] [F20.O7.KR1] Update CAD and worked on [F20.O8.KR1] Aasif Patel Warn Member only attended 1 meeting over the development cycle ————— ———————- ————————————————————————————————————————————